Choose a practice by the job it needs to do: infiltrate runoff, retain it for reuse, remove pollutants or reduce a discharge peak. Then check the drainage area, soil, groundwater and maintenance needs. GI classification and individual stormwater credits are separate entries in the manual's practice summaries. Manual 9.4, p. 1 Manual 9.7, p. 1

Start here What the group contains
Chapter 9: small-scale GI Distributed practices, including roof capture, bioretention, pervious paving and small infiltration systems
Chapter 10: large-scale GI Larger infiltration, filtration, wetland and pond designs, with objective-specific selection conditions
Chapter 11: non-GI Detention, certified treatment devices and other non-GI treatment systems

The chapter tables list the usual waiver or variance conditions. N.J.A.C. 7:8-5.3 also contains conditional exceptions, including provisions for qualifying public transportation projects. Check the actual project against the rule before selecting a Chapter 10 or 11 practice. N.J.A.C. 7:8-5.3

Rain gardens and tree pits are bioretention applications. A trench, membrane system or oil/grit separator needs a design- or device-specific classification before a credit can be assigned. Manual 9.7, p. 2 Manual 11.3, p. 1

Using the source editions

Each practice page links to the January 2026 chapter and the earlier collection, with page-specific citations beside the design values. Check the printed revision date: the earlier collection includes later replacement chapters and is not a uniform July 2023 snapshot.

The January 2026 volumetric-reduction framework adds a compliance objective. Infiltration, reuse and evapotranspiration were already described in earlier practice chapters. See the rule comparison and Manual 14, p. 1.

Start with GI requirements, site constraints, drainage-area limits and BMP selection.