GWR Permit Review Checklist¶
An 8-gate interactive checklist for reviewing groundwater recharge (GWR) compliance in New Jersey stormwater management reports (SMRs), implementing N.J.A.C. 7:8 and the NJ BMP Manual.
How to Use¶
- Set the header - Enter the project name, county, rule era (2023 Legacy or 2026 REAL Rule), and review date.
- Work through each gate - Expand any gate, review each item, select a status (PASS / FAIL / NOT DEMONSTRATED / N/A), and add reviewer notes.
- Use the calculators - Gates G3, G4, and G5 include embedded calculators for storage volume, drain time, and SHWT separation.
- Export - Export a CSV log of all items, or export a printable deficiency report if issues are found.
Tip: Your review session is saved automatically in browser storage. Refresh the page to confirm.
Launch the Tool¶
Gate Summary¶
| Gate | Topic | Fail Behavior |
|---|---|---|
| G0 | Project Applicability & Rule Era | Fail-closed -> locks G2-G7 |
| G1 | Fatal Constraints (HPL, Contamination, Pretreatment) | Fail-closed -> locks G2-G7 |
| G2 | Soil Evidence Chain (K_design) | Evidence review; G0/G1 are the enforced prerequisites |
| G3 | Storage Volume Math | Fail = storage deficit |
| G4 | Drain Time Verification | Fail = over-limit (>72 hr) |
| G5 | SHWT Separation & Mounding | Configuration-specific static separation and hydraulic impacts |
| G6 | NJGRS Recharge Reconstruction | Conditional (if NJGRS credit claimed) |
| G7 | Deliverable Integrity | Fail = unsigned/incomplete package |
Choosing a source edition¶
The selector records the comparison edition used in your review. It does not decide which rules govern the project. Department transition provisions include permit-program, completeness, expiration and scope conditions; municipal review has a separate pathway. The September 21, 2026 amendment extends the relevant Department transition date to before July 20, 2027 while retaining those conditions.
Both comparison editions contain current and projected rainfall factors, the woods/good pre-construction presumption with documented alternatives, and infiltration hydraulic-impact requirements. Static groundwater separation depends on the selected BMP configuration. See the Regulatory Explorer, July 2023 rule, section 1.6 and Table 5-6, and September 2026 rule, section 1.6.
Calculator inputs and results are saved locally and included in exports. Changing county or edition clears review selections while retaining notes and calculator inputs. Older saved reviews retain notes but require new selections because the criteria have changed. A passing arithmetic check does not establish complete BMP eligibility, project compliance or permit approval. All-N/A and incomplete prerequisite reviews do not unlock later gates.