Chapter 9 covers small-scale green infrastructure. Choose the practice and drainage configuration before sizing: an underdrained system can treat runoff without providing recharge, while a roof system can reduce runoff without receiving water-quality credit. Manual 9.6, p. 1 Manual 9.4, p. 1

Practice Main use and point to check
Cistern Roof-runoff reuse; confirm demand can restore storage between storms. Manual 9.1, p. 4
Dry well Clean-roof infiltration; maximum contributing area 1 acre. Manual 9.2, p. 1
Grass swale Vegetated flow treatment; check length, depth and velocity. Manual 9.3, p. 1
Green roof Roof retention and evapotranspiration; check the building and growing-medium design. Manual 9.4, p. 1
Pervious paving Permeable pavement over storage; distinguish infiltrating and underdrained versions. Manual 9.6, p. 3
Bioretention Planted soil-bed treatment; rain gardens and tree pits or trenches are applications. Manual 9.7, p. 2
Infiltration basin Surface or subsurface infiltration; maximum contributing area 2.5 acres. Manual 9.8, p. 1
Sand filter Sand filtration followed by infiltration; maximum contributing area 2.5 acres. Manual 9.9, p. 1
Vegetative filter strip Sheet-flow treatment; preserve distributed inflow through healthy vegetation. Manual 9.10, p. 1

For GI manufactured treatment devices, consult Manual 9.5, p. 1 and the actual model's certification. The product name does not establish its treatment rate or permitted configuration.

Subsurface gravel wetlands are covered by non-GI Chapter 11.5. That chapter lists water-quality use under a waiver or variance and no GI, quantity or recharge credit. Manual 11.5, p. 1

Check GI selection and exceptions, site constraints and drainage-area limits. N.J.A.C. 7:8-5.3