Soil Permeability and Testing¶
Concept Explanation¶
Saturated hydraulic conductivity describes how readily saturated soil transmits water. The measured result identifies the soil's capacity; the design rate accounts for uncertainty and the proposed BMP. For the Chapter 13 initial model, divide the slowest eligible tested rate of the governing restrictive layer by 2 and apply the 10 in/hr maximum. The selected BMP chapter supplies its own limits. Manual 12, Mar. 2024, p. 1 Manual 13, Jan. 2026, p. 4
Both stored Chapter 12 copies are printed March 2024. Their placement in different collections does not make the investigation requirements a new January 2026 rule. Manual 12, Mar. 2024, 2023 collection, p. 1 Manual 12, Mar. 2024, p. 1
Engineering Evaluation¶
Investigation and sampling¶
| Infiltration layout | Investigation requirements |
|---|---|
| Default category | At least two profile pits in the infiltration area. Add the pits required for infiltration areas larger than 10,000 ft². |
| Distributed BMPs, each no more than 500 ft² | At least one pit per soil mapping unit and one boring per BMP; locate the shared pit at or near the geographic center of the associated borings. |
| Small-scale infiltrating GI BMPs larger than 500 ft², excluding porous paving | A pit for each applicable soil mapping unit and two borings per BMP. |
| Qualifying linear BMP | Length at least four times width, bottom width no more than 25 ft and top width no more than 40 ft. Apply the chapter's separate pit/boring spacing. |
Perform at least one applicable conductivity test at every required pit and boring. For the distributed small-BMP categories located along a roadway, add the required pit for every 2,000 linear feet. A qualifying linear BMP has a pit in the first 500 ft of each mapping unit, with further pits and borings at the intervals in Chapter 12. Manual 12, Mar. 2024, p. 15 Manual 12, Mar. 2024, p. 16 Manual 12, Mar. 2024, p. 17
Locate investigations in the actual infiltration area, which excludes BMP sides, walls and slopes. If the design moves, check the same-mapping-unit and investigation-location conditions before reusing the tests. Manual 12, Mar. 2024, p. 15 Manual 12, Mar. 2024, p. 17
Find and test the governing layer¶
Extend infiltration-BMP pits and borings at least 8 ft below the lowest basin bottom or twice the maximum potential water depth from the largest design storm, whichever is greater. Test the most restrictive horizon or substratum in the chapter's investigation range above SHWT or nonfractured bedrock. Manual 12, Mar. 2024, p. 19
Use the bottom of the required sand or soil layer as the reference where those layers are present. Extra soil replacement below the required layers does not automatically move that reference; Table 12-8 illustrates the replacement cases. Manual 12, Mar. 2024, p. 19 Manual 12, Mar. 2024, p. 20
Methods and stages¶
Preconstruction methods include tube permeameter, percolation, single-ring infiltration, ASTM D3385 double-ring, USBR 7300-89 and other recognized, published in-situ methods. Convert percolation results using the chapter's conductivity procedure. A minutes-per-inch result cannot be entered directly as inches per hour. Manual 12, Mar. 2024, p. 27 Manual 12, Mar. 2024, p. 32 Manual 12, Mar. 2024, p. 34
Fractured-bedrock basin flooding is a pass/fail test, not a measured conductivity rate. A passing test has the chapter's three-foot maximum design water-depth condition; it does not establish an unrestricted infiltration design. Follow its test-location and groundwater restrictions. Manual 12, Mar. 2024, p. 27 Manual 12, Mar. 2024, p. 44
After construction activities that could change conductivity, test the excavation bottom before placing sand or soil media. Use the required number of tests and permitted methods: single-ring, modified basin flooding, double-ring or a similar method without a test hole in the soil layer. The installed result must equal or exceed the governing preconstruction tested conductivity. A licensed professional engineer certifies the results, which go to the review agency and as-built record. Manual 12, Mar. 2024, p. 28 Manual 12, Mar. 2024, p. 29
Practical interpretation¶
For dry wells and small infiltration basins, the listed 0.5 in/hr minimum is a design rate. With a factor of safety of 2, that requires an eligible tested rate of at least 1.0 in/hr. Record the test method, soil layer, depth, units and any conversion with the result. Manual 9.2, Jan. 2026, p. 1 Manual 9.8, Jan. 2026, p. 1 Manual 12, Mar. 2024, p. 19 Manual 12, Mar. 2024, p. 27
Affected BMPs¶
- dry wells and small infiltration basins: use the native-soil design rate and confirm the practice's minimum and maximum values. Manual 9.2, Jan. 2026, p. 1 Manual 9.8, Jan. 2026, p. 1
- Infiltrating bioretention, including rain gardens and tree pits: check native subsoil as well as the soil bed. Underdrained bioretention instead needs the specified soil-bed and underdrain performance checks. Manual 9.7, Jan. 2026, p. 12
- pervious paving, small sand filters, large sand filters and larger infiltration layouts: identify whether the design relies on infiltration before selecting the investigation category and rate. Manual 12, Mar. 2024, p. 14
- wet ponds and constructed wetlands: soil conductivity may need testing to demonstrate that excessive seepage will not defeat the permanent-pool design. Manual 12, Mar. 2024, p. 15
Related Regulations¶
Use Chapter 12 for field investigation and Chapter 13 for the groundwater model. The rule requires a design that avoids adverse hydraulic impacts from infiltration. N.J.A.C. 7:8-5.2(h), Sept. 2026, p. 31