Hydrodynamic Separator¶
A hydrodynamic separator removes pollutants by settling in a controlled flow-through chamber. Chapter 11.3 describes vortex, baffle and laminar-plate arrangements, alone or in combination. Filtration devices form a separate category in the same chapter. Manual 11.3, p. 1
The chapter's hydrodynamic devices are non-GI water-quality units. Use the exact model's certified removal rate; they do not receive recharge or quantity credit. Manual 11.3, p. 1 Manual 11.3, p. 5
Size the device from its certified maximum treatment flow using the Water Quality Design Storm (WQDS) peak. Obtain both the NJDEP certification and NJCAT verification report, and match the tested installation. Manual 11.3, p. 1 Manual 11.3, p. 5
Do not add a grate inlet directly into the unit unless that inlet was tested. Inlet and outlet pipes must follow the verified angles; absent testing for another arrangement, only a straight-through 180° arrangement is acceptable. Quality use also has to satisfy the rule's GI selection conditions. Manual 11.3, p. 3 N.J.A.C. 7:8-5.3
Use the model's required separation from seasonal high water table (SHWT); Chapter 11.3 does not supply one distance for every device. Provide watertight joints, the required structural loading capacity, safe overflow and maintenance access. Downstream connections must remain accessible for inspection. Manual 11.3, p. 3
Inspect structural components at least annually and sediment- and debris-catching components at least twice a year and after storms exceeding 1 inch. The maintenance plan must set allowable oil, sediment and debris accumulation levels, with removal when those limits are reached. Follow the manufacturer's additional maintenance requirements. Manual 11.3, p. 5 Manual 11.3, p. 6
Check standing water against the intended device design. If standing water is not part of that design, correct the problem and revise the maintenance manual. Manual 11.3, p. 6
The installed flow path differs from testing. A new grate inlet or changed pipe angle can invalidate the assumed treatment configuration. Check the model's verification documents before accepting the change. Manual 11.3, p. 3
Captured material is left in the chamber. Track sediment, oil and debris against the plan's cleanout limits. Provide access that allows the required service to occur. Manual 11.3, p. 6
Source chapters: January 2026 · Earlier collection. Check the date printed on the chapter when comparing editions.
N.J.A.C. 7:8-5.2(j) requires NJCAT verification and NJDEP certification of device pollutant-removal rates. This library does not assign approval to an unnamed model.
N.J.A.C. 7:8-5.3 sets the GI selection requirements and exceptions; N.J.A.C. 7:8-5.8 covers maintenance plans for major development.