Reports¶
Phase Output Reports
Read the comparisons and design explanations below with their linked original sources. They distinguish the July 2023 and January 2026 rules and each manual chapter's printed revision. The rules comparison also explains the later September 2026 applicability amendment. Standalone HTML and downloadable Markdown are generated from the same maintained report text.
Phase Reports¶
| # | Title | View |
|---|---|---|
| 1 | Regulatory Audit — N.J.A.C. 7:8 (2023 vs. 2026) | Open → |
| 2 | Planning Content — Development Impacts & Regional SWM Plans | Open → |
| 3 | Engineering Content — Pollutant Removal · Standards · Recharge | Open → |
| 4 | Maintenance & Retrofit Protocol | Open → |
| 5 | Small-Scale GI BMPs — Chapter 9 | Open → |
| 6 | Large-Scale GI Systems — Chapter 10 | Open → |
| 7 | Non-GI Practices & MTDs — Chapter 11 | Open → |
| 8 | Master 2026 Synthesis — Subsurface, Mounding & Volumetric Reduction | Open → |
Download Source Reports¶
Downloadable Markdown source files for each published phase report.
| # | Source Report | Download |
|---|---|---|
| 1 | Regulatory Audit | Download .md |
| 2 | Planning Content | Download .md |
| 3 | Engineering Content | Download .md |
| 4 | Maintenance Protocol | Download .md |
| 5 | Small-Scale GI | Download .md |
| 6 | Large-Scale GI | Download .md |
| 7 | Non-GI / MTD | Download .md |
| 8 | Master 2026 | Download .md |