Wet Pond: GI and Non-GI Configurations¶
A wet pond maintains a permanent pool. Sediment settles in that pool, and storage above it can attenuate larger storms. Chapter 10.5 covers ponds with the planting and reuse features required for GI; Chapter 11.6 covers non-GI wet ponds. Neither configuration receives recharge credit. Manual 10.5, p. 1 Manual 11.6, p. 1
For the Chapter 10.5 GI configuration, provide both a native-vegetation buffer at least 10 ft wide along at least 50% of the shoreline and a stormwater-retention component for beneficial reuse. Reuse must capture runoff from 1.25 in of rainfall over the pond's drainage area. Do not count WQDS runoff already infiltrated by an upstream BMP again as beneficial reuse. Manual 10.5, p. 1 Manual 10.5, p. 4
| Item | Pond criterion |
|---|---|
| Permanent-pool volume / WQDS runoff volume | At least 1:1 |
| Permanent-pool surface area | At least 0.25 acre |
| Recommended pool length-to-width ratio | 3:1 |
| Optional extended detention | 12–24 hours |
WQDS means Water Quality Design Storm. Chapter 10.5 lists 50% total suspended solids (TSS) removal at a 1:1 pool-volume ratio, with up to 90% when the required extended detention is provided. Quality use follows the chapter's waiver/variance entry and the applicable rule conditions. Manual 10.5, p. 1
The usual minimum contributing area is 20 acres. A smaller area requires a detailed daily water budget for wet, dry and average years, including reuse demand. Pumping groundwater to maintain the pool is prohibited. Manual 10.5, p. 3
Check whether a liner or soil modification is needed to hold the permanent pool. A pond that lacks the required native buffer or beneficial reuse must be evaluated under the non-GI chapter. The quantity and quality selection conditions differ between those configurations. Manual 10.5, p. 4 Manual 11.6, p. 1
For the GI pond, inspect sediment- and debris-catching components at least twice a year and after storms exceeding 1 inch; inspect structures, pumps, controls and alarms annually. Clean the forebay at 6 in of sediment, 10% volume loss, or standing water nine hours after a storm. Maintain the required vegetation and safe access to reuse equipment. Manual 10.5, p. 16
Plan for accumulated sediment to reduce pool storage over time. Record normal return-to-pool drain time and include liner testing, repair and replacement where a liner is used. Apply Chapter 11.6's maintenance provisions to a non-GI pond. Manual 10.5, p. 15 Manual 10.5, p. 17 Manual 11.6, p. 1
The pool shrinks or dries out. An incomplete water budget, leakage or unaccounted reuse can lower the pool. Check the water balance and anti-seepage components. Manual 10.5, p. 3 Manual 10.5, p. 17
Sediment displaces storage. Deposits reduce the permanent pool and its treatment capacity. Track sediment and cleanout needs rather than waiting for the pond to appear full. Manual 10.5, p. 15
GI features are omitted or stop working. Both the shoreline buffer and reuse component are required for the Chapter 10.5 configuration. A landscaped edge alone is insufficient. Manual 10.5, p. 1
Source chapters: January 2026 · Earlier collection. Check the date printed on the chapter when comparing editions.
Non-GI wet ponds: Manual 11.6, p. 1.
N.J.A.C. 7:8-5.3 sets the GI selection requirements and exceptions; N.J.A.C. 7:8-5.8 covers maintenance plans for major development.